StockMarketWire.com - Beowulf Mining said drilling had commenced at its Aitolampi graphite project in Finland.

The company said it planned to drill up to 15 holes over two phases. A drilling contract wasawarded local Finnish outfit Oy Northdril.

The first phase would be drilled on snow-covered ground and take three-to-four weeks to complete, with samples being sent for analysis and testwork concurrently with drilling.

After information collected from the first phase was fully analysed, the second phase would commence, most likely in the summer of 2018.


At 2:44pm: [LON:BEM] Beowulf Mining PLC share price was +0.62p at 8.5p



Story provided by StockMarketWire.com