StockMarketWire.com - ECR Minerals said that drilling at the Black Cat gold prospect in Australia's Victoria state had commenced, with the first two holes already completed.

Composite samples representing 4m down-hole lengths would be compiled from drill cuttings and sent to be assayed for gold.

After receipt of the assay results, composites returning anomalous gold grades would be re-sampled and re-sent for assay.

The assay turnaround time was estimated to be two-to-six weeks.


At 2:42pm: [LON:ECR] ECR Minerals PLC share price was -0.02p at 0.88p



Story provided by StockMarketWire.com