StockMarketWire.com - Shanta Gold said the measured mineral resource estimate at the Singida gold project in Tanzania had increased by 56%.

The measured and indicated resource now totaled 382k oucnes of gold at 2.08 grams per tonne, the company said.

Project capital funding was being targeted from external third parties at the Singida asset level, it added.


At 2:55pm: [LON:SHG] Shanta Gold Ltd share price was +0.2p at 6.25p



Story provided by StockMarketWire.com