StockMarketWire.com - Beowulf Mining said it had upgraded the mineral resource estimate for its Aitolampi graphite project in Finland.

The company reported an 81% increase in contained graphite for the prospect's higher-grade western zone, with an indicated and inferred mineral resource of 17.2m tonnes.

The resource was measured at 5.2% total graphitic carbon, containing 887,000 tonnes of contained graphite.


At 2:30pm: [LON:BEM] Beowulf Mining PLC share price was 0p at 6.25p



Story provided by StockMarketWire.com